AddEnergie SmartTWO Instrukcja instalacji - Strona 16

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Ładowarka AddEnergie SmartTWO. AddEnergie SmartTWO 20 stron.
Również dla AddEnergie SmartTWO: Skrócona instrukcja obsługi (4 strony)

Front Panel & Base Cover Installation
INSTRUCTIONS:
1. For a pedestal installation, insert base covers into each of the main structure
down to the ground and fasten them with the provided hardware.
2. Slide the front panels into each of the main structures.
3. Fasten each front panel's two mounting brackets with bolts and star washers.
Step 1
frontaux avec les vis et les rondelles étoilées (star
washer).
Tighten each front panel's two mounting brackets
with bolts and star washers.
Vue de dessus
Top View
© 2019 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED Information and specifications contained in this document are subject to change, amendments and additions at any time, without notice
Glisser le panneau frontal en place.
Step 2
Slide front panels into position.
frontaux avec les vis et les rondelles étoilées (star
washer).
Tighten each front panel's two mounting brackets
with bolts and star washers.
Vue de dessus
Top View
Glisser le panneau frontal en place.
Step 3
Slide front panels into position.
frontaux avec
washer).
Tighten each
with bolts and
Vue de
Top V
16