3onedata IES6300 Series Instrukcja szybkiej instalacji - Strona 2
Przeglądaj online lub pobierz pdf Instrukcja szybkiej instalacji dla Przełącznik 3onedata IES6300 Series. 3onedata IES6300 Series 4 stron. Managed industrial ethernet switch
Również dla 3onedata IES6300 Series: Instrukcja szybkiej instalacji (5 strony)
Model IV
Model VI, Model VII
Model IX
1.
Terminal blocks for Power Supply P1/P2 Input
2.
Terminal blocks for Power Supply L/N Input
3.
Terminal blocks for relay alarm output RELAY
4.
DIP switch
5.
Console port
6.
Grounding screw
7.
DIN-Rail mounting kit
8.
Power indicator
9.
Running indicator (RUN)
10. Alarm indicator (ALM)
11. PoE indicator (G1-G8)
12. Ethernet port indicator (G1-G12)
13. 10/100/1000Base-T(X) copper port (G1-G8)
14. 10/100/1000Base-T(X) Gigabit PoE copper port (G1-G8)
15. I/O input and output interfaces (DI1-DI2, DO1-DO2)
Model V
16. I/O output indicator (DO1-DO2)
17. I/O input indicator (DI1-DI2)
18. 100/1000Base-X SFP slot (G11-G12)
19. 100/1000/2.5GBase-X, SFP slot(G9-G10)
20. Wall-mounting location hole
【Mounting Dimension】
Unit: mm
Model VIII
Notice Before Mounting:
Don't place or install the device in area near water or
moist, keep the relative humidity of the device
surrounding between 5%~95% without condensation.
Model X
Before power on, first confirm the supported power
supply specification to avoid over-voltage damaging the
device.
The device surface temperature is high after running;
please don't directly contact to avoid scalding.
【DIN-Rail Mounting】
The product adopts 35mm standard DIN-Rail mounting which
is suitable for most industrial scenes, mounting steps as
follows:
Check if the DIN-Rail mounting kit is installed firmly.
Insert the bottom of DIN-Rail mounting kit (one side
with spring support) into DIN-Rail, and then insert the
top into DIN-Rail.
Tips:
Insert a little to the bottom, lift upward and then insert to
the top.
Check and confirm the product is firmly installed on
DIN-Rail, then mounting ends.
【Disassembling DIN-Rail】
Power off the device.
After lifting the device upward slightly, first shift out
the top of DIN-Rail mounting kit, and then shift out the
bottom of DIN-Rail, disassembling ends.
Notice before power on:
Power ON operation: First insert the power supply
terminal block into the device power supply interface,
then plug the power supply plug contact and power on.
Power OFF operation: First, remove the power plug, then
remove the wiring section of terminal block. Please pay
attention to the above operation sequence.
【DC Power Supply Connection】
The DC device of the series provides 6-
pin 5.08mm pitch power supply terminal
blocks and power supply occupies the left
4 pins. It supports two independent DC
power supply systems, P1 and P2. The
series of device supports redundant