AU Optronics BenQ PM060MW2 Instrukcja instalacji - Strona 10

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Panel słoneczny AU Optronics BenQ PM060MW2. AU Optronics BenQ PM060MW2 20 stron. Solar photovoltaic modules

AU Optronics BenQ PM060MW2 Instrukcja instalacji

3.2 Mounting with Clamps

• The clamping clips on the side frame must be in parallel (see Figure 1).
• Ensure the clamps are of sufficient design strength to allow for the maximum design
pressure of the module.
• Measurements of D1, D2, D3, and D4 below describe the centerline of the mounting
clamp to the edge of the module frame.
• Clips and clamps are not provided by BenQ Solar.
• There are two clamping methods available (see below for specific measurements):
o Clamp on the long side of the frame (see Figure 2, measurements below)
o Clamp on the short side of the frame (see Figure 3, measurements below)
2013/7/25
Figure 1 1 1 1 Top view and back view of installed module
Figure
Figure
Figure
Figure 2 2 2 2 Long rail mounting clamp range (D1 and D2)
Figure
Figure
Figure
9