Anzzi 1068281 Instrukcja instalacji - Strona 8
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Armatura łazienkowa Anzzi 1068281. Anzzi 1068281 16 stron.
INSTALLATION (HANDSHOWER)
Figure 1
Step 1A
Insert the hand shower holder through the pre-drilled hole on the shower panel.
Step 1B
Install the water supply hose for the hand shower onto the holder, as shown.
Step 1C
Make sure all O-rings are inserted to prevent leakage.
Step 1D
Once the shower panel is fully installed and hung on the bracket, you can install the hand
shower hose to the holder connection.
PERFECTION IS OUR TRADITION™
pg. 6