Anzzi CS-FRKDGL00 Series Instrukcja instalacji i obsługi - Strona 4
Przeglądaj online lub pobierz pdf Instrukcja instalacji i obsługi dla Armatura łazienkowa Anzzi CS-FRKDGL00 Series. Anzzi CS-FRKDGL00 Series 5 stron. Console sink
A
Section 1
1.Place the stand upright in the desired location and lev-
el using the height adjusters built into the bottom of the
stand.
2.Use a pencil and the pre-drilled holes in the stand fra-
me to mark location of mounting hardware on wall.
3.Drill holes for mounting hardware in the wall.
4.Insert anchors into the holes and secure the stand to
the wall with the screws.
5.Apply silicone adhesive to the frame of the lower shelf
and then place the glass plate on the frame.
NOTE: Silicone adhesive and tools necessary for installation are NOT included.
3pcs
drilling holes Φ3/8" (8mm)
B
A
B
Section 2
1.Apply a thin coat of silicone adhesive to the back of
the sink where it meets the wall.
2.Apply a thin coat of silicone adhesive to the stand's
top frame where the sink will rest.
3.Carefully place the sink on the top frame of the stand
and center it.4.Allow silicone adhesive to dry for 24
hours.
3pcs