Duerkopp Adler 745-28 Instrukcja instalacji - Strona 12

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Maszyna do szycia Duerkopp Adler 745-28. Duerkopp Adler 745-28 18 stron.

Duerkopp Adler 745-28 Instrukcja instalacji

3.8 Suction device (accessory)

1
2
5
9
12
The suction device (order no. 0722 004282) facilitates the exact
positioning of materials on the working table.
Attention!
Do not reverse hoses 2 and 5.
Hose 2 must always be connected to pipe socket 6.
The pneumatically-operated air valve is fitted to pipe socket 6.
Lay hose 2 from the settling container 7 to the vacuum-connection
socket 1 of the sewing-machine table.
Connect compressed-air hose 3 from cylinder 4 of the air valve to
the Y41 solenoid valve.
Connect hose 5 to pipe socket 8 of settling container 7.
Connect other end of hose to on-site vacuum equipment or to the
centrifugal blower.
Note:
If there is no on-site vacuum equipment a centrifugal blower must
also be ordered.
Attention!
It is essential for filter bag 9 to be fitted beneath hose 5.
Filter bag 9 protects the vacuum generator from being penetrated by
dust and particles of dirt.
Hoses 2 and 5 must therefore on no account be swapped.
2
3
4
6
7
5
8