Anzzi SD-AZ01-01 Instrukcja instalacji - Strona 9

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Armatura łazienkowa Anzzi SD-AZ01-01. Anzzi SD-AZ01-01 10 stron. Glass shower door

Anzzi SD-AZ01-01 Instrukcja instalacji
HARDWARE
10. Affix the Handles (10) to the Glass Door (06). Place the Anti-Water Strips
(07) firmly on the vertical edges of the Stationary Glass and the Glass Door.
For a tight close, secure the Magnetic Strip (09) on the vertical edges of the
Glass Door.
11. Make any final adjustments to the assembled unit in the Wall Profiles (04)
before using a Ø 1/8" drill bit to drill holes in the Wall Profile and Glass Profile
(01).
NOTICE: Only drill the first layer of the wall profile and glass profile. Do NOT
drill the profiles throughout.
Use the Round Head Screws ST4x12 (15) to affix the Wall Profile to the Glass
Profile. Use the Decorative Covers (15) to cover the visible screw heads.
12. Carefully add the sealant along the guide rails and profiles, along the
shower base or threshold, and on the seams between the profiles and lower
guide rail.
WARNING: WAIT 24 HOURS BEFORE USING THE SHOWER
ENCLOSURE TO ALLOW THE SILICONE GEL TO DRY COMPLETELY.