Dunster House HANGOVER APEX G4-1824HAB Instrukcja instalacji - Strona 11

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Domki ogrodowe Dunster House HANGOVER APEX G4-1824HAB. Dunster House HANGOVER APEX G4-1824HAB 18 stron. Bar 1.8m x 2.4m (6ft x 8ft)

G4 - 1824HAB HANGOVER APEX BAR 1.8m x 2.4m - Assembly Steps
STEP 3: ROOF SUPPORT
Items:
1x SPLIT FRONT PANEL TOP
4x ST-PT3535430
4X ST-PT3535270.30
4X ST-PT3535540.30.60
1X ST-PT15121465.120.Z
1x ST-PT15121333.30
1x ST-PT1582141.30.A
To build the Roof Support Brackets, begin by fixing ST-PT3535430 to ST-PT3535270.30
Using 1x 60mm Screw.
ST-PT3535540.30.60
Nail 14x 30mm Nails to the shiplaps to the side of the end brackets as shown in
the image to the right.
Ensure ST-PT15121465.120.Z is flush to the previously assembled Roof Support
Bracket.
Repeat the previous steps for the other side of the shed.
SPLIT FRONT PANEL TOP
SCREW 70 mm
** Pre-drill parts before fixing screws **
1x ST-PT15121465.120.Z.B
1x ST-PT15121333.30.B
1x ST-PT1582141.30.B
12x 60mm Screws
8x 70mm Screws
28x 30mm Nails
Fix ST-PT3535540.30.60 to the previously assembly structure, use 2x
60mm Screw.
Repeat 3x for the remainder of the Roof Support Brackets.
Fix the Roof Support Brackets through the Split Front Panel
Top.
use 2x 70mm Screws per bracket.
ST-PT3535270.30
ST-PT1582141.30
ST-PT15121333.30
ST-PT15121465.120.Z
ST-PT3535430
PIN NAIL 30 mm
Front View
ST-PT15121465.120.Z
Flush
Page 11