Troubleshooting
Time lag switch "clicks" off but load stays on:
• Non-resistive load (contactor, emergency, CFL, LED or 2D lamp)
Add CAPLOAD across the load as shown in wiring diagram.
• Fault developed due to an over-voltage spike.
Slave switch does not operate the time lag switch:
• Ensure only DANLERS slave switches are used
• Ensure slave wiring is less than 10m long.
Load latched either on or off:
• Fault developed due to on over-voltage spike.
Does not work with existing 2-way switches:
• Time lags and slaves can use the wiring of two way (and
intermediate) systems, but cannot be mixed with such systems.
Precautions and Warranty
This product conforms to BS EN 60669-2-1.
Please ensure the most recent edition of the appropriate local wiring regulations are observed
and suitable protection is provided e.g. 6 amps over current, 1kV over voltage. Please ensure
that this device is disconnected from the supply if an insulation test is made.
This product is covered by a warranty which extends to 5 years from the date of manufacture.
Products available from DANLERS
• PIR occupancy switches • Daylight linked dimmers • Manual high frequency dimmers
• Photocells • Radio remote controls • Time lag switches • Outdoor security switches
• Dimmers • Heating, ventilation and air-conditioning controls • Bespoke / O.E.M. products
Please call for more information or a free catalogue, or visit our website.
DANLERS Limited, Vincients Road, CHIPPENHAM, Wiltshire, SN14 6NQ, UK.
Telephone: +44 (0)1249 443377 Fax: +44 (0)1249 443388
E-mail: [email protected]
Web: www.danlers.co.uk
Company Registered Number 2570169 VAT Registration Number 543 5491 38
12/02/14
Grid time lag switches (2-wire versions)
GRTL MK
GRTL MK ILM
DANLERS grid time lag switches are suitable for fitting into the MK
Grid Plus (MK), Crabtree grid (CB) and Eurodata plates (EU).
A short press will switch the load on and it will switch off automatically
after the time lag period has expired. The time lag can be set between
approximately 1 minute and 2 hours.
The button on the illuminated versions (ending ILM) is lit until the
button is pressed, it comes back on when the time lag has elapsed.
The load can be switched on from other locations by connecting these
devices in parallel or by connecting DANLERS matching slave switches,
available as: SSGS MK, SSGS CB and SSGS EU.
Loading
DANLERS grid time lag switches can switch up to 6amps (1500W) of:
• Fluorescent lamps, either high frequency or switch start
• Incandescent or mains halogen lamps
• Electronic or wire wound transformers.
They can also switch up to:
• 1 amp (250W) of Fans or Metal Halide lamps.
Grid wall box depths
The grid time lag switches need the following depth wall boxes:
• GRTL MK (ILM)
• GRTL CB (ILM)
• GRTL EU (ILM)
INS911 GRTL
Installation notes
GRTL CB
GRTL EU
GRTL CB ILM
GRTL EU ILM
(recommended with integral safety fuse)
35mm (minimum)
40mm (minimum)
35mm (minimum)