Duratuf PG98 Instrukcja montażu - Strona 3

Przeglądaj online lub pobierz pdf Instrukcja montażu dla Przechowywanie na zewnątrz Duratuf PG98. Duratuf PG98 16 stron.

Duratuf PG98 Instrukcja montażu
CONGRATULATIONS ON PURCHASING A DURATUF GARRISON SHED.
BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS
Read all instructions carefully
Identify all parts and check quantities against parts list
Select a level site
Do not mark cladding with pencil as lead can cause corrosion to cladding
During assembly, ensure all drill filings are removed between layers of steel, before riveting together
Do not attempt to build your shed in high winds
Beware of sharp edges, recommend use of gloves
Protect your eyes and ears
For ease of assembly, use a friend to help
DRILL
HAMMER
Following are the minimum requirements for cladding used in Garrison Sheds.
Wash all surfaces annually using a hose and soft nylon brush.
Within 2 km of coast – wash every 3 months as above. After a storm, wash the cladding and the gutters as soon
as possible to remove any highly corrosive salt deposits.
Volcanic Ash Fallout – wash as soon as possible, removing fall out from roof and gutters.
Do not allow manures, chemicals or other corrosive materials to have direct contact with cladding
BEFORE YOU START:
SAFETY:
TOOLS REQUIRED:
RIVETER
SQUARE DRILL BIT
NAIL PUNCH
TAPE MEASURE
WARRANTY REQUIREMENTS:
3.5mm DRILL BIT
HEX DRIVE
2
LADDER
SKILL SAW
(timber floor only)
.
: