STEP 3:
• Ensure shed is sitting level and square.
• Beginning from the left hand end (looking from front) centralise the Roof sheets on the Ridge Beam.
• Ensure that the Roof is tight against the Gable Wall Sheets. Screw 1 x 50mm Roofing screw through the 1st pan into
the Ridge Beam. (a - fig.2).
• At the back left hand corner, (from front) line up the ribs on the Roof Sheet with the ribs on the Wall Sheet then using
1 x 50mm Clout, predrill and nail Roof Sheet through the rib into the Top Plate. (b– fig.2.)Repeat at the front left hand
corner. (c - fig.2).
STEP 4:
• Centralise the Roof at the other end (R/H end) with the
Ridge Beam.
• Using 1 x 50mm Roofing Screw, fix roof sheet though the
pan, to the other end of Ridge Beam. (d–fig.2).
• Using 2 x 50mm Clouts fix sheet though rib to front & back
Top Plates. (e–fig.2).
• Ensure that the Ridge Beam is straight, screw roof sheets
to ridge beam beside each overlap, through the pan using
3 x 50mm Roofing screws.
• Ensure the Front and Back Top Plates are straight. Screw
the roof sheets to the front & back Top Plates, through the
ribs, using 1 x Roofing Screw per rib. (fig.1).
STEP 5:
• Place barge flashings on roof at end of shed ensuring the
diagonal trimmed end is facing out. (See diagram on pg 5)
• Rivet the Barge Flashings to the roof and the side wall, using
four rivets on top of barge and four into the side (fig.3).
STEP 6:
• Rivet the Ridge Cap to the centre of the roof using 8 x
rivets as shown (fig.2).
STEP 7:
• Place spouting in position and rivet to Barge Flashings at
each end and rivet to roof sheets (1 rivet per 1 sheet) (fig.4).
IMPORTANT
Use 50mm Clouts only on ribs covered by flashings, shown in fig.2.
Predrill holes using a 3.5mm drill bit.
Use Roofing Screws on all other ribs and pans.
Ensure screws are not overtightened as this can damage the seals and
cause the shed to leak.
b
a
SIDE
WALL
c
fig.3
13
= Clout
= Screw
TOP PLATE
BACK WALL
BOTTOM PLATE
RIDGE BEAM
Barge
X 4
X 4
Spouting
Pan
Rib
fig.1
e
SIDE
WALL
d
c
FRONT WALL
e
fig.2
fig.4