ROOF ASSEMBLY CONT...
STEP 3:
• Position 1 x roof sheet so that the top of the sheet is at the
centre of the Ridge Beam and the side of the sheet over hangs
the end of the Ridge Beam and the Top Plate by 15mm.
• Ensure the Ridge Beam and the Top Plate are straight.
• Nail /screw 4 x corners of the Roof Sheet as shown, ensuring
the ribs on the Roof Sheet line up with the front Roof Sheet
and the back Wall Sheet. Fasten off the first sheet.
STEP 4:
• Position the second Roof Sheet, and rivet to first roof sheet as
shown.
• Fasten off as per Step 2.
• Rivet and nail/screw off the remaining Roof Sheets, ensuring
the ribs line up with the front Roof Sheets and the back Wall
Sheets.
STEP 5:
• Place barge flashings on roof at end of shed
ensuring the diagonal trimmed end is facing
out. (See diagram on pg 5)
• Rivet the Barge Flashings to the roof and the
side wall, using four rivets on top of barge and
four into the side (fig.3).
STEP 6:
• Rivet the 2 Ridge Caps together using four
rivets, so total flashing is 3.050m long. Rivet
the Ridge Cap to the centre of the roof using
10 x rivets as shown (fig.2).
STEP 7:
• Place spouting in position and rivet to Barge Flashings
at each end and rivet to roof sheets (1 rivet per 1
sheet) (fig.4).
SIDE
WALL
SIDE
WALL
BACK WALL
RIDGE
SIDE
WALL
Barge
X 4
fig.3
13
TOP PLATE
BACK WALL
BOTTOM PLATE
FRONT WALL
TOP PLATE
BACK WALL
BOTTOM PLATE
FRONT WALL
= Clout
= Screw
TOP PLATE
SIDE
BOTTOM PLATE
WALL
FRONT
WALL
X 4
Spouting
SIDE
SIDE
fig.1
fig.2
fig.4