Duratuf KIWI KL1 Instrukcja montażu - Strona 10
Przeglądaj online lub pobierz pdf Instrukcja montażu dla Przechowywanie na zewnątrz Duratuf KIWI KL1. Duratuf KIWI KL1 16 stron.
Step 1: Position Door Track (107) on the front wall 45mm down
from underside of Roof, with right hand end 20mm in
from outside edge of right-hand corner flashing.
Pre - drill hole in centre of track and screw in place
using, one 45mm door track screw.
Remove ALL drill filings.
Note: Ensure Door Track screws are screwed in horizontal and
screwed hard into flashing. Protruding screw heads can
cause door rollers to bind on the screw heads.
Hang door in the Door Track. At the right hand end of
Step 2:
Door Track, adjust up or down so that the Door hangs
parallel with shed. Fit one rivet at right hand end to
hold in place. Repeat with left hand end of track.
Note: Only use rivets at each end of track.
Step 3: Remove the Door. Pre-drill and screw another 2
screws between centre screw and the rivets at each
end (5 screws per track). Screw track using 45mm
door track screws.
Step 4: Clean out ALL drill filings. Also make sure the Wheels are
cleaned of drill filings. Re-hang Door.
Door Stops: Predrill a hole in right-hand end of track,45mm
in from outside edge of Corner Flashing.
Predrill hole in left-hand end of track, 45mm from outside
edge of corner flashing. (60mm for Security door option.)
Screw door stops in using 1 x Roofing screw per stop.
Check door doesn't protrude past outside edge of shed.
Step 5: Bottom Door Guide: Slide the Door to the corner of the shed.
Place the Door Guide (108) over the Guide Brackets on the
door and align the end of the Door Guide 20mm in from outside
of the right-hand corner flashing.
Step 6: Lift the door guide up approximately 3mm so that the Door will
Slide freely. Pre-drill a hole through the door guide and the end
rib of the cladding and screw in place using a 45mm screw.
Step7:
Slide the door to the centre, ensuring that it slides freely. Pre-
drill and insert a screw in the other end of the Door Guide.
Check that the Door is not binding in the middle then pre-drill
and fix with 3 more screws, one in the centre of the guide and
the other 2 evenly spaced between (5 screws per guide) into
the door step flashing and rib.
Note:
For sheds with Raised Base Plate option the Door Step Flash-
ing will protrude down past the Bottom Plate.
Attach Door Guide with rivets.
KL1 DOOR
KL1 DOOR
10
CLADDING
DOOR
BOT-
PLATE
GUIDE BRACKET
DOOR
GUIDE