DURKOPP ADLER 911 Instrukcja obsługi i instalacji - Strona 14

Przeglądaj online lub pobierz pdf Instrukcja obsługi i instalacji dla Maszyna do szycia DURKOPP ADLER 911. DURKOPP ADLER 911 18 stron. Cnc-controlled sewing unit with large sewing area

DURKOPP ADLER 911 Instrukcja obsługi i instalacji
5.

Electrical connection

5.1 Connecting to the mains

5.2 Checking the nominal voltage

5.3 Direction of rotation of the sewing motor

10
ATTENTION!
All work on the electrical equipment of this sewing unit may only be
carried out by qualified electricians or other appropriately trained
persons.
The mains plug must be pulled out.
Plug the mains cable into the socket.
230V -50/60 Hz
ATTENTION!
The nominal voltage indicated at the type plate and the mains voltage
must correspond!
The sewing unit is equipped with the newest step motor technology. It
is not necessary to check the direction of rotation, this being set
automatically by the control unit.