CB2 STOWAWAY BED Instrukcja montażu - Strona 7
Przeglądaj online lub pobierz pdf Instrukcja montażu dla Wyposażenie wnętrz CB2 STOWAWAY BED. CB2 STOWAWAY BED 8 stron.
stowaway
Slide drawer bottom into corresponding
10
grooves of drawer assembly as shown.
12
Made in Vietnam - r12
BED
drawer
bottom
Customer Service 800.606.6252 | Latest instructions available at www.cb2.com
Attach dowels of drawer back into correspond-
ing holes of drawer side. Secure drawer side
11
to drawer back with 2 large screws as shown.
Fit remaining drawer side into corresponding
holes of drawer back and front as shown and
secure with 4 large screws. Repeat steps 9-12
for all remaining drawer assemblies.
drawer
side
drawer
back
Page 7 of 8