Aircommand Sparrow Mk4 Instrukcja obsługi - Strona 8
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Klimatyzator Aircommand Sparrow Mk4. Aircommand Sparrow Mk4 17 stron. Air conditioning unit
Również dla Aircommand Sparrow Mk4: Instrukcja obsługi (17 strony)
Sparrow Mk4 Installation Guide V5
4. POSITION SPARROW ON ROOF
Remove the air conditioner from the
carton and move to installation
position.
Put a circle of sealant around each
bolt hole in the weather collar.
Position the unit over the weather
collar. The unit will engage with the
collar and self-align (Fig 6).
The unit weights approximately
28kg. Ensure a two person lift or
use a mechanical hoist to avoid
the risk of injury.
DO NOT slide the unit on the
roof, this may damage the
weather collar and result in
leaks.
Four M8 mounting holes on the
chassis
underneath
conditioner will line up with the
corresponding holes on
weather collar.
5. CONNECT ELECTRICAL SUPPLY
This unit MUST be installed in
accordance
with
regulations and in particular AS3001
– 2008.
Refer Fig 7 for position of terminal
block.
Connect electrical supply to terminal
strip. Note position of active, neutral
and ground wires (Fig 8).
WARNING
This work should only be performed by a
licenced electrical tradesperson.
Ensure that power is properly
disconnected at the supply (mains
and/or battery)
When connecting wires into terminal strip
apply suitable clamping pressure to
ensure wire is secure while taking care
not to over tighten and damage the
exposed wire ends.
Apply circle of sealant
the
air
the
Fig 6: Apply sealant around bolt holes and then position unit over the weather collar and set
SAA
Wiring
Fig 8: Wiring diagram of power connection from external supply to air conditioner
TH
28
May 2015
around 4 bolt holes
Fig 7: Highlights the position of the terminal strip underneath the unit
down gently.
Page 8 of 16