Great Lakes GL24SRD Instrukcja instalacji - Strona 7

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Stojaki i stojaki Great Lakes GL24SRD. Great Lakes GL24SRD 12 stron. 19" eia srd swing rack
Również dla Great Lakes GL24SRD: Instrukcja instalacji (8 strony)

Great Lakes GL24SRD Instrukcja instalacji
UNIVERSAL
The 19" EIA Swing Frame Rack can be hinged (retractable pin) on either side.
Customer needs to determine which side is to open. To open, simply retract
8
7
both pins (top and bottom) and then open the Swing Frame Rack similar to
that of a door.
LEFT HAND SWING
CAUTION:
LEFT HAND
When installing 19" EIA equipment, make sure both retractable pins (2) are
secured into the rear section that has been mounted to the wall. Be sure
8
7
all screws, nuts, and mounting hardware are tightened before loading with
equipment.
6
6
8
D
C
B
Secure retractable pins into
A
receptacle (2 locations)
8
5
4
OR
RIGHT HAND SWING
5
7
4
7
3
RIGHT HAND
6
3
5
6
5
2
1
2
1
4
7
4
D
C
B
A