Great Lakes GL840EZ-3042 Instrukcja instalacji - Strona 11
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Stojaki i stojaki Great Lakes GL840EZ-3042. Great Lakes GL840EZ-3042 17 stron. Ez seismic cabinet
OPTIONAL ACCESSORIES
OVERHEAD CABLE TROUGH
When ordered with the cabinet,
the overhead cable trough ships
assembled, but not installed. The
top of the EZ cabinet has a variety
of mounting holes. Place the trough
where you require cable routing.
ZERO RMU MOUNTING, ZR1 & ZR2
Both ZR bracket kits (ZR1 and ZR2) fit on the EZ cabinet. These allow
for "0" RMU mounting of 19" rack mount power strip units or other 1
or 2 RMU equipment (such as patch panels). Install the bracket onto
the rail or post toward the side panel. It is important to ensure you
have 18.31" between the inner holes for 19" mounting.
1 RMU
18.31"
#10-32 x 1/2" Pan
Head Screws
2 RMU
18.31"
11