Hi-Velocity HE PS-1750 Instrukcja instalacji i obsługi - Strona 4

Przeglądaj online lub pobierz pdf Instrukcja instalacji i obsługi dla Oczyszczacz powietrza Hi-Velocity HE PS-1750. Hi-Velocity HE PS-1750 8 stron.

HE PS
Air Flow
Fig. 3 Vertical Installation
4.
When installing the HE PS to a Hi-Velocity 50 or
70 fan coil, a transition should be made (Fig. 4) or simply
block air flow with a piece of sheet metal (Fig. 5).
Top View
Transition
Transition
RPM-E-70
HE/HV/HE-Z-70
Fan Coil
Fig. 4 Transition
Hi-Velocity Fancoil
RPM-E
Return Air Base
Return Air Base
HE PS
Create transition from
18 ga. sheet metal
HE/HV/HE-Z-70
Fig. 5 Block Air Flow
Tape all seams between the air handler and the
outlet side of the HE PS so there can be no air bypassing
5.
the system.
Attach the air handler to the outlet side of the
HE PS and fasten with #10 x 3/8 self-drilling sheet
6.
metal screws.
NOTE: Only 1/2 inch of clearance has been provided
between the outer and inner case.
Slide the components into the outer case
and tighten locking knobs finger tight. Make sure the
7.
inner module will freely slide in and out of the outside
enclosure.
Plug in the power cord to any 120vac outlet
and check both sight ports to make sure both lamps
8.
are
illuminated. Ultraviolet lamps must remain on at
all times regardless of thermostat or AirCycler settings.
Check the service panel (Fig. 11). The LED
lights should be flashing in sequence for a 15 second
9.
period of time and then return to green. The filter lamp
should be flashing green and the UV lamp light should
be a steady green.
Set the thermostat or the AirCycler to operate
the fan unit for at least 25 minutes every hour. If air
10.
quality problems persist after one week, increase the
fan unit operating time by (5) minute intervals.
(3)
Top View
HE PS
RPM-E-70
Block air flow with
18 ga. sheet metal
Fan Coil
© 1995-2009 Energy Saving Products Ltd.