AFFIX MADW 720-AGR Instrukcja montażu - Strona 7
Przeglądaj online lub pobierz pdf Instrukcja montażu dla Pulpit AFFIX MADW 720-AGR. AFFIX MADW 720-AGR 20 stron. Aluminium double width mobile towers
ASSEMBLY
06
FIRST LEVEL
Step 1
Insert the Castor Wheels with the jack
pipe inside the bottom of the tubes of
the 1st level 2 Rung Ladder Frame and
2 Rung Span Frame.
DO NOT USE Hammer.
DO NOT USE Hammer.
Step 2
Step 2.1
Step 2.1
Hook both the bottom 2 Horizontal Braces
horizontally to the Span frame and the
Ladder Frame's vertical pipes, just above
the 1st rung.
Step 2.2
Step 2.2
Lock all the four wheels by pressing the
lock gear with foot.
Step 2.3
Step 2.3
One person should hold the frame in
upright position during this step.