GREAT PLAINS YP1025A3P Instrukcja instalacji - Strona 6
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Siewniki GREAT PLAINS YP1025A3P. GREAT PLAINS YP1025A3P 7 stron. Meter hopper seal, for the 1.6/3.0 bushel hopper
6
Meter Hopper Seal
Refer to Figure 4
6. Make sure the holes on the hopper line up with the
holes on the hopper mount.
If the holes do not line up, remove the hopper and
trim the seed chute about
5
7. Install the four
/
-18 x 3/4 inch bolts (1), flat
16
washers (2), and flange nuts (3) to a torque of
60 in-lb or 5 ft-lb.
8. Repeat the procedure for each hopper.
403-788M
1
1
/
inch to
/
inch.
8
4
1
Figure 4
Fasten Hopper to Mount
Great Plains Manufacturing, Inc.
3
2
1
38930
09/26/16