INSTALLATION
TRANSFORMERS)
1.1 Preamble
The following installation procedure is given for information only. Automation 2000
cannot be held responsible for its execution.
1.2 Installation precautions
Before installing the DGPT2
The transformer is not powered.
The transformer dielectric is at ambient temperature (approx. 20°C).
The dielectric level inside the transformer is slightly below the transformer
tank cover.
The transformer opening on which the DGPT2
1.3 Installation procedure
Remove the drain tap and the level indicator float.
Fit the FPM seal (supplied) in the DGPT2
Mount the DGPT2
Attach the fixing hooks (supplied) on the fixing bolts (3 at 120° or
4 at 90°) according to the tightening precautions (see page 4). The fixing bolts
must be located on a circle with a 97 mm diameter (±2 mm).
Fill the DGPT2
highest point.
Put back the level indicator float into place and close the DGPT2
drain tap.
Drain tap
Fixing hook
TECH. INSTRUCTIONS
DGPT2
®
A U T O M A T I O N 2 0 0 0
(COMPLETELY
, make sure that:
®
on the transformer opening designed for that purpose.
®
with transformer dielectric until its level reaches the DGPT2
®
FILLED
will be installed is opened.
®
attachment flange throat.
®