AirCycler g2-k Podręcznik szkoleniowy - Strona 8
Przeglądaj online lub pobierz pdf Podręcznik szkoleniowy dla Wentylator AirCycler g2-k. AirCycler g2-k 20 stron.
Również dla AirCycler g2-k: Instrukcja instalacji i obsługi (11 strony), Podręcznik testowania instalacji (2 strony), Podręcznik testowania instalacji (2 strony)
1.0 THEORY OF OPERATION
1.1 OPERATION DETAILS
The AirCycler® g2 Furnace Fan Timer is integrated with the home's central furnace fan so that any time the central
fan is turned on by the thermostat to provide heating or cooling, the AirCycler® g2 opens the motorized damper to
let in a measured amount of fresh air. The fresh air is then distributed uniformly throughout the home through the
existing ductwork.
When ventilation requirements are met, the damper is closed to prevent over-ventilation.
Should regular heating and cooling cycles not run long enough to meet the desired or required ventilation, the
AirCycler® g2 can turn on the smaller and more economical bathroom exhaust fan (or other exhaust fan) through the
optional FanConnect™ Switch.
With no need to run the large central fan to provide additional ventilation, homeowner complaints of cold air or noisy
operation are eliminated and efficiency is drastically improved.
1.2 OPERATION EXAMPLES
0
CENTRAL FAN
DAMPER
OPEN
20 MINUTES OF
HEATING/COOLING
20 MIN x 90 CFM
VENTILATION
REQUIREMENT
Enough ventilation took place during normal heating/cooling cycles to meet ventilation requirements for the hour.
ONE HOUR VENTILATION (MINUTES)
VENTILATION REQUIREMENTS = 30 CFM CONTINUOUS OR 1,800 CF/HR
NORMAL CENTRAL FAN OPERATION ONLY
15
DAMPER
CLOSED
=
1,800 CF
COMPLETE
= NORMAL OPERATION
No need for additional ventilation forced by AirCycler® g2.
30
= OCCUPANT ACTIVITY/AIRCYCLER® G2 FORCED EXHAUST
8
45
AC DOC 8.5
REV 7/2020
60