Gainsborough K202 Instrukcje użytkowania - Strona 2
Przeglądaj online lub pobierz pdf Instrukcje użytkowania dla Fontanna zewnętrzna Gainsborough K202. Gainsborough K202 5 stron.
Solar 3 Tier Bronze Water Feature
Please read and retain these instructions for future reference
Before using first time
Allow panel to charge for at least 8 hours in full sunlight.
Find an ideal Place for the Solar Light.
Place the solar panel in an area where it will receive direct sunlight for at least 8 hours per day. The number
of hours the pump will work is directly proportional to the hours of sunlight it receives. If the panel is placed
in a shaded area, it will not be able to fully charge and its pumping time will be limited.
Assembly
1. Place the fountain
base on a smooth level
surface. Attach the post
connector to the
fountain base. Screw the
post into the post
connector by twisting it
clockwise with the
threads. Ensure that both
the post and the post
connector are snug.
3. Insert the pump housing pipe into the hole on top of
the pump. Rotate the nut and washer on the pipe until
they are tight at the top of the pump housing. Ensure that
the rectangular guide is flush with the raised areas. The
bottom of the pump should be flat against the base of the
pump housing.
Instructions for Use
K202
2. Fit the pump (attached
to the fountain basin)
into the pump housing
on the side with the gap.
(Note: The pump cord
fits into the gap).
v001: 13/08/21