Celexon Manual Economy Instrukcja obsługi - Strona 6

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Akcesoria do projektorów Celexon Manual Economy. Celexon Manual Economy 11 stron.
Również dla Celexon Manual Economy: Podręcznik użytkownika (8 strony)

Celexon Manual Economy Instrukcja obsługi
MOUNTING ON THE CEILING (SCREWED)*
Measure the distance between the ho-
les in the side caps (two per cap) and
transfer them to the ceiling. Drill the
holes at the markings with the right
diameter drillbit for the diameter of the
mounting material, insert and screw
the screen in place tightly. Make sure
that the holes are parallel to the wall!
Use dowels and screws suitable for
your mounting surface.
Caution:
Do
not
screws! If you notice cracks in the caps
they must be replaced! The screen
must not be used with cracked caps.
Please ensure that the metal plates are
also used for wall and ceiling mounting,
otherwise a safe installation cannot be
guaranteed).
* Electric Economy series screens with a cloth width greater / equal 240 cm
can only be mounted on the ceiling via eyelets.
overtighten
the
5