Galiso HDD-8RB Instrukcja obsługi - Strona 7

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Suszarka Galiso HDD-8RB. Galiso HDD-8RB 12 stron. With digital control
Również dla Galiso HDD-8RB: Instrukcja instalacji/obsługi (14 strony)

PA!! 4) OPERA TION..
1.
Set the thermostat at the desired temperature and switch the HDD-8RB on. Let
it warm up while draining cylinders completely of water.
2.
Insert the blower tube into the cylinder.
3.
Bring the cylinder into position below a manifold outlet. Connect the blower tube
by pushing up into the quick connector. CAUTION: Avoid bending the tube or
otherwise damaging the tube or connector.
4.
After cylinders have been drying for about 25 minutes, check each cylinder for
dryness and hook up the next cylinder.
5.
The first three positions are always open to insure minimum of air flow. Use
these positions first when drying cylinders.
6.
To shut down at the end of the day, turn the thermostat to "OFF". Let the motor
run for an additional 15 minutes to cool the unit down.