Galvin Engineering CliniLever TCWSC150C Instrukcje instalacji - Strona 2

Przeglądaj online lub pobierz pdf Instrukcje instalacji dla Produkt hydrauliczny Galvin Engineering CliniLever TCWSC150C. Galvin Engineering CliniLever TCWSC150C 5 stron. Hospital wall sink set taps w/ 190 gooseneck outlet

Product Installation Guidelines

PRE-INSTALLATION -

In-wall valve body
In-wall valve body must have G5/8"
female
connection.
Body should be mounted between 0
and 15mm behind the finished wall
surface.
© Galvin Engineering Pty Ltd

MOUNTING DETAILS

head
to
body
thred
TCWSC150C/TCWSJ150C
Wall spud
Wall spud must be ½" BSP male thred and
-
protrude from the finished wall by no more than
15mm
Note: In some situations, a male thread
connection on the spout may be more suited. If
so, please contact us on 1300 514 074
Note: Before installation, all lines must be flushed. We
recommend that a line strainer be installed prior to taps
to eliminate any foreign material.
TCWSC80C/TCWSJ80C
Document No.: 001.00.10.08
Version 1, 12 July 2022, Page 2 of 5