Galvin Engineering Ezy-Drink TD25XEB Podręcznik - Strona 3

Przeglądaj online lub pobierz pdf Podręcznik dla Produkt hydrauliczny Galvin Engineering Ezy-Drink TD25XEB. Galvin Engineering Ezy-Drink TD25XEB 5 stron.

INSTALLATION

IMPORTANT: Galvin Engineering products must be installed in accordance with these installation instructions
and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical
supply conditions must also comply to the applicable national and/or state standards. Failing to comply with
these provisions shall void the product warranty and may affect the performance of the product.
1. Fit Body & Mouthguard Outlet
Remove the lock nut.
Fit the body into the trough ensuring the
rubber o-ring is placed between the
trough and the body.
Secure outlet underneath with the
supplied back nut and tighten the screws
using a 2.5mm hex key
Take care not to over-tighten.
3. Fit the Piezo Button
Fit the piezo button and coloured washer
into the pre-drilled hole.
NOTE: Ensure the o-ring is between the
button and the coloured washer.
Secure using the supplied nut.
Version 2, 23
Solenoid
Coil
2. Fit Solenoid and Outlet
Fix the solenoid in position ensuring that the
solenoid coil is not facing downwards.
Fit the flexi hose to solenoid outlet and bubbler.
Connect water supply to solenoid inlet.
4. Connect the Piezo Button to the Controller
Connect the controller to the solenoid, piezo button
and battery pack.
rd
March 2021, Page 3 of 5