Galvin Specialised Ezy-Drink CP-BS Lead Safe Instalacja Manualline - Strona 2
Przeglądaj online lub pobierz pdf Instalacja Manualline dla Dozownik wody Galvin Specialised Ezy-Drink CP-BS Lead Safe. Galvin Specialised Ezy-Drink CP-BS Lead Safe 5 stron. Hob mounted bottle filler tap with reduced flange
Version 1, 1 May 2020, Page 2 of 5
PRE-INSTALLATION -
If the mounting holes do not already exist, mark out and drill the holes in the bench/trough, as shown in
rough-in dimensions.
Note: Before installation, all lines must be flushed. We recommend that a line strainer be installed prior to the bottle
filler tap to eliminate any foreign material.
INSTALLATION
IMPORTANT: Galvin Specialised products must be installed in accordance with these installation instructions
and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical
supply conditions must also comply to the applicable national and/or state standards. Failing to comply with
these provisions shall void the product warranty and may affect the performance of the product.
1. Disassemble
Remove nut & cup washer from assembly.
MOUNTING DETAILS
Version 1,30
Rough-In Dimensions
2. Fit bottle filler
Fit bottle filler to basin as shown.
th
April 2020, Page 2 of 5