Galvo Shed GVO 1508 Instrukcja montażu - Strona 2

Przeglądaj online lub pobierz pdf Instrukcja montażu dla Przechowywanie na zewnątrz Galvo Shed GVO 1508. Galvo Shed GVO 1508 8 stron. Sloping roof shed

COMPONENTS CHECKLIST

Please check all components carefully and advise your supplier immediately if any discrepancies.
Remember to quote the code on the front page.
1 x 1770 x 780mm door sheet
A
2 x 980mm x 780mm sheets for roof
D
4 x 735mm 'U' channels
G
for side walls
2 x 780mm 'U' channels (door top
J
and bottom)
1 x 310mm door plate
M
IMPORTANT!
• Remove the swarf (drill filings) from the panels as you assemble them.
• All components are cut to length. Do not cut any parts unless instructed.
• Fixings through the inside of the channels into the sheeting are just as important as
fixings from the outside.
RIBS AND PANS
• Generally most fixings are spaced at 300mm apart.
• Keep the fixings in the pans as close to the ribs as possible for added strength.
• Ribs will always protrude to the outside of the shed.
• Extra internal fixings are strongly recommended in high wind areas.
BUILDING YOUR SHED
• The basic task is to join the sheets together to
form your panels, and fix channels to the top
and bottom of these panels. They will then join
together to form your shed (diagram 1, 2, and 3).
2
1 x narrow 1830 x 715mm sheet
B
for front wall, beside door
2 x 1830 - 1770mm sloping sheets
E
(side walls, 1 left & 1 right)
2 x 1770mm 'U' channels
H
for door sides
2 x 980mm 'L' flashings (roof to
K
side flashings)
1 x Pack of rivets, 1 x Riveter, 1 x Drill bit
and 2 x 'z' door braces per door. And a
N
padbolt pack with wide flanged rivets for
fixing the padbolt on to the door and door
jamb.
DIAGRAM 1
1
2 x 1770 x 780mm sheets for back wall
C
6 x 1515mm 'U' channels for front,
F
back and roof.
2 x 793mm 'U' channels
I
(door spacers)
2 x 1830mm 'Z' door jambs. (1 length
L
has 'U' channel attached)
Door bracing
O
PAN
DIAGRAM 2
If you choose to vary from these instructions your warranty will be impaired
RIB
DIAGRAM 3