15. Route the remaining distribution fiber slack through the fiber routing section of the IDC. (Figure 27)
16. Use local accepted practices to label the distribution fiber connection in the appropriate space on the door label,
as applicable.
17. Repeat Steps 10 – 16 for each addition distribution fiber needing to be connected.
PASS THROUGH CONNECTION
1. Using local engineering practices, determine the appropriate distribution fiber to be used for a pass through
connection. Remove the corresponding fiber storage cartridge from the swing down tray by pushing in and
pulling up on the cartridge arms.
2. Remove the desired distribution fiber from the cartridge by sliding the connector out of the housing location
and continue to route the cable out of the cartridge.
3. For best practice, it is recommended that the distribution fiber be routed back to the cable transition.
Ensuring the distribution fiber has a clear path to the fiber routing section of the IDC.
4. Use local accepted practices to clean the distribution fiber connector end face.
5. Connect the distribution fiber to the appropriate port on the input field.
6. Use the foam fiber relief to route the distribution fiber to the fiber routing section of the IDC.
Employing a similar technique to that used with the jumper cable.
7. Route the remaining distribution fiber slack through the fiber routing section of the IDC.
8. Repeat Steps 1 – 7 for each addition pass through connection.
Note: Unused fibers should remain in the fiber storage cartridge until needed.
INSTALLATION INSTRUCTIONS
4.8 mm Drop
Figure 27
14
IDEAA
Interior Distribution Cabinet
®