Dynojet GSX1300R Instrukcje instalacji - Strona 3

Przeglądaj online lub pobierz pdf Instrukcje instalacji dla Kontroler Dynojet GSX1300R. Dynojet GSX1300R 3 stron. Fuel controller for 2008 suzuki

Ground wire
i339-411
www.powercommander.com
9
PCIII harness
10
11
12
13
14
Attach the ground wire from the PCIII
to the negative side of the battery
(Fig. D).
Install the PCIII in the tail section
using the supplied velcro.
to clean both surfaces with the alcohol
swab before attaching.
Bolt fuel tank back into place.
Locate the stock O2 sensor connec-
tion.
This connection is behind the
right hand side fairing.
needs to be pulled away from the
frame to gain access but does not
need to be totally removed.
Plug the Dynojet O2 eliminator into
the stock wiring harness.
O2 sensor will not be connected to
anything.
Reinstall fairing.
2008 Suzuki Hayabusa - PCIII USB - 3
Make sure
The fairing
The stock