Gree RVA-150R Instrukcja obsługi i instalacji - Strona 3
Przeglądaj online lub pobierz pdf Instrukcja obsługi i instalacji dla Klimatyzator Gree RVA-150R. Gree RVA-150R 20 stron. Recreational vehicle air conditioner
- 1. Air Conditioner
- 1. 1 A few Words about Your New Air Conditioning Unit
- 1. Electrical Data
- 2. Table of Contents
- 2. 2 Electric Diagram
- 3. 3 Packing List
- 4. 4 Specifications
- 5. 5 Operation of Wireless Remote Control
- 6. 6 Control Panel
- 7. 7 Installation Instruction
- 7. Step 1-Selecting an Installation Location & Installing the Roof Top Air Conditioner
- 7. Step 2-Installing the Ceiling Assembly
- 7. Step 3-Electrical Wiring
- 7. Step 4-Completing the Installation
- 8. 8 Troubleshooting Guide
- 9. 9 Normal Maintenance Procedures
A FEW WORDS ABOUT YOUR NEW
Thank you for choosing the GREE Recreational Vehicle Air Conditioner.
This manual will supply you with all the information for installation, operation and maintenance.
Take a few minutes to discover how to get the most in cooling comfort and economic operation
from your new air conditioner.
Please keep this manual well for future reference.
1.
All wiring must be complied with local and national electrical codes. All wiring
must be installed by qualified electricians. If you have any questions about the
following instructions, contact a qualified electrician.
2.
Check the available power supply and resolve any wiring problems BEFORE installing
and operating this unit.
3.
This air conditioner is designed to operate from a 115V AC, 60Hz, 1 Phase power
supply.
4.
The wiring diagrams are located on the cover of the control box. The assembly unit
wire diagrams are located on the ceiling panel.
AIR CONDITIONING UNIT
ELECTRICAL DATA
- 1 -