Gamma Progression 200 Instrukcja obsługi - Strona 9
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Maszyny naciągowe Gamma Progression 200. Gamma Progression 200 16 stron.
STRINGING THE FRAME
Clamping the String
Clamp the tensioned string to the next ad-
jacent string using the second string clamp.
Release the tensioned string by raising the
tension arm.
Repeat the procedure for all of the remaining
main strings and tie off following the racquet
manufacturers recommendations.
Starting the Cross Strings
Follow the manufacturer's recommended
stringing pattern for one or two piece string-
ing. This will determine the starting point for
the cross strings. Weave the fi rst two cross
strings and pull tension and clamp the cross
strings to each other.
Finishing the String Job
Weave and tension the remaining cross
strings and tie off at the specifi ed grommet
hole.
Remove the strung racquet from the reverse
order of mounting.
9