Gamma Progression ES II+ Instrukcja obsługi - Strona 10

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Maszyny naciągowe Gamma Progression ES II+. Gamma Progression ES II+ 17 stron.

Gamma Progression ES II+ Instrukcja obsługi
STRINGING THE FRAME
Clamping the First Main String
Secure the tensioned main string using the
remaining fixed clamp. Repeat the proce-
dure for all of the remaining main strings and
tie off following the racquet manufacturers
recommendations.
Follow the manufacturer's recommended
stringing pattern for one or two piece string-
ing. This will determine the starting point for
the cross strings. If applicable, tie the first
cross string using an appropriate starting
knot.
Weaving the Cross Strings
Weave the cross strings over and under the
main strings being careful to alternate the
weave direction of each consecutive cross
string so as to be opposite of the previously
installed cross string.
Once the final cross string is tensioned and
clamped, tie off at the appropriate hole speci-
fied by the racquet manufacturer.
9