Gamma Progression ST II Instrukcja obsługi - Strona 13

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Maszyny naciągowe Gamma Progression ST II. Gamma Progression ST II 19 stron.
Również dla Gamma Progression ST II: Instrukcja obsługi (17 strony)

Gamma Progression ST II Instrukcja obsługi
MAINTENANCE & ADJUSTMENTS
A
B
Tension Calibration Procedure
Set the tension to 60 lbs. as indicated by the
linear scale and rotary knob. Place the string
on one end of a tension calibrator into a string
clamp and secure. Place string located on
the other end of the calibrator into the string
tensioner and apply tension. If the brake lever
releases before or after 60 lbs., the tension
head should be calibrated as follows.
Loosen the 1.5 mm locking set screw (A)
located on the side of the latching block as
shown. The set screw is used to hold the
adjustment screw in place.
If the lever releases before 60 lbs., using
the supplied L-shaped hex wrench, turn
the adjustment screw (B) located on the left
side of the latch block counter-clockwise to
increase the engagement of the brake release
latch with the brake lever. Repeat step 1 and
adjust until the correct tension is indicated
on the calibrator.
If the tension indicated in step 1 is greater than
60 lbs., turn the adjustment screw clockwise to
reduce the engagement of the brake release
latch with the brake lever. Repeat step 1 and
adjust until the correct tension is indicated
on the calibrator.
Tighten locking set screw (A) when fi nished.
14