GAP SUPER C Instrukcja instalacji i montażu - Strona 9

Przeglądaj online lub pobierz pdf Instrukcja instalacji i montażu dla Antena GAP SUPER C. GAP SUPER C 17 stron.

E . Locate the remaining two 69 ¾" inch tubes. Place these tubes parallel to the H assembly just created, one tube on
each side. Slide four PVC corners on the two remaining 70" 1" x 1" tubes with the prongs all facing the same way. Space
two corners at the ends of each tube and space the other two corners 22 inches from the ends.
F. To properly place the middle two corners use the 22" tubes as a guide again. This allows you to position the middle
two corners on each long tube, 22" from the corners positioned on the ends. See above. Place these 70" assemblies
perpendicular to the ends of the four tubes referenced below.
G. Now align the "H" frame tubes and the two parallel 69 ¾" inch beams with the prongs on the 70" tube. Slide all four
prongs into the open ends of 1" x 1" tubes at the same time and snug. Make sure all corners are properly positioned.
H. A support bracket is required to interface the control grid and the basket assembly. Locate the 2" x 2" x 24" right
angle aluminum bracket. Attach the pipe support bracket to the 2"x 2" angle aluminum bracket with one of the U-bolts.
Use the holes in the middle of the bracket and attach the pipe support bracket to the face of the 2"x2" aluminum stock with
the supplied U-bolt. Now line up the large holes on your H frame with the holes at the ends of the 2"x2" angle stock, insert
the 4 stainless bolts and tighten. The frame is complete!
3-4 Mesh Assembly
1)Locate the 2 pieces of 24" x 71 ½ " and 24"x23 ½ " stretched aluminum mesh sections. Place the two 24" x 71 ½ "
pieces over the 24" x 72" frame. Use the figure below as a guide. Make sure the long edge of the mesh entirely covers the