CORNING ONE GX Podręcznik z informacjami ogólnymi - Strona 4

Przeglądaj online lub pobierz pdf Podręcznik z informacjami ogólnymi dla Przyrządy pomiarowe CORNING ONE GX. CORNING ONE GX 12 stron. Higher power 40 w dual-band wcs/2.5 ghz tdd das remote
Również dla CORNING ONE GX: Arkusz szybkiej instalacji (14 strony)

3.
REQUIRED HEADEND CONNECTIONS FOR
DEPLOYMENTS WITH CORNING® OPTICAL
NETWORK EVOLUTION (ONE™) SOLUTION
IMPORTANT! Each HEU supports up to eight GX remotes.
The following additional elements are required (ordered
separately):
• Optical central hub(s) — OCH-4-WDM or OCH-8-WDM;
installed in 19-in communication rack with HEU
• Interface box — installed in 19-in communication rack
with HEU and OCH
• ERFCv2-OCH cable
• SC-450 – installed in 19-in communication rack with the
HEU and OCH
Notes:
Refer to the quick installation sheets provided
with the IFB, OCH, and SC-450 for instructions
on how to install the units.
Refer to Figure 1 for an example of where to
install the units in the communication rack in
order to facilitate the cable connections.
Step 1:
Refer to Figure 2 and connect the 9-pin
connector side of the ERFCv2-OCH cable to
an available HEU/IHU RIX port and secure the
connector in place.
Note:
Each ERFCv2 cable supports HEU-to-IFB UL/DL
connections for three service groups and one
10 MHz clock reference connection.
Step 2:
Connect a pair of the ERFCv2 cable UL/DL
QMA connectors to each of the three IFB
UL/DL service group input ports (i.e., SG1,
SG2, and SG3).
Step 3:
Connect the single ERFCv2 10 MHz cable
connector to the IFB 10 MHz port, located in
the middle of the front panel.
Step 4:
Perform Steps 1-2 above for second HEU if
installed (no need for 10 MHz clock reference
connection).
Corning Optical Communications
Figure 1. Example of Rack Configuration
Figure 2. HEU-to-IFB Connections
Quick Installation Sheet | CMA-600-AEN | Page 4