Garden Oasis Steel Round Gazebo Instrukcja obsługi - Strona 12

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Meble ogrodowe Garden Oasis Steel Round Gazebo. Garden Oasis Steel Round Gazebo 14 stron.

Step 8
F
Z
10
Z
7
Fig 3
Step8:
***
This step requires 6 people and 6 step ladders
1.
Put 6 Posts (F) vertically and close to the Post Holder (O) on the roof structure.
have 6 person lift the roof onto the Post (B). Adjust the Post's position to ensure the screw holes
are in line with Post Holder (F).
2.
Secure the Posts (F) to Post Holder (O) with 5pcs M6x15 Screws (Z) on each Post (F).
Refer to Fig.1
Also tighten the screws on the Cambered Rail (C) one more time in case the screw in the
connection part loosen during moving and assembling.
3.
Insert Plastic Groves (Z9) into the holes on the Post (F) ( the one has 2 extra screw holes )
as shown in Fig.2; Install the Light Control Holder (Z7) on the Post (F). Push the Countersunk Screw
(Z10) through the Light Control Holder (Z7) and into the Post (F). Refer to Fig.3
Fig 2
Z
9
Fig 1
O
F
F
Z
10