FIREBOX INSTALLATION INSTRUCTIONS

Any vent-free Gas Log Heater must be "For use with approved ANSI
Z21.11.2 unvented room heater."
Follow and complete the installation instructions of the gas log set
and the requirements of this firebox.
Check all fittings for leaks before lighting the gas log set.
In planning the installation for the firebox, it is necessary to determine
where the unit is to be installed and whether optional accessories
are desired. Gas supply piping should also be planned at this time.
A gas shut off must be in this line.
The firebox can be mounted on any of these surfaces:
1. A flat hard combustible or non-combustible surface.
2. A raised platform of combustible or non-combustible material.
3. Recessed into the floor as illustrated by Figure 4.
4. Supported under all (4) corners of the firebox so that contact
is made on all four perimeter edges on the bottom of the unit
(Example: Four (4) concrete masonry blocks).
FLUSH FACE
COMBUSTIBLE MATERIALS ALLOWED
If the firebox is installed directly on carpeting, tile or other combustible
material other than wood flooring, it should be installed on a metal
or wood panel extending the full width and depth of the unit.
At this point, you should have decided what components to include
in your installation, and where the firebox is to be located. If this
has not been done, stop and consult your dealer for assistance
with this planning.
Planning Your Installation
Accessory kits such as the FBB5 Blower kit, Trim kits, Mantels, plus
other Decorative Frame, Hood, and Door accessory kits may be
installed after the firebox is secured to the framing.
Refer to the instructions provided with each of the optional accessory
kits for proper installation and operation.
Firebox Framing
Firebox framing can be built before or after the firebox is set in place.
Framing should be constructed to accommodate wall covering and
firebox facing material. The firebox framing should be constructed
of 2 x 4 lumber or heavier. The framing headers may rest on the
top of the firebox standoffs. Refer to Figure 5 for firebox framing
dimensions.
Page 6
LOUVERED
Figure 4
Note: On Peninsula models, a maximum weight of 250 lbs. is
recommended when construction materials are supported by the
top standoff spacers.
Framing - Peninsula
Framing - See-Through
Premium Vent-Free Firebox Framing Dimensions (in
"A"
Model
Framing
Height
VFP36SB
41 1/2"
VFP36PB
41 1/2"
Attention: Add height of base to "A" Dimension when elevat-
ing firebox if installing on an elevated base.
Framing dimension A incudes a three inch clearance for
standoffs on firebox.
*Dimension "C" assumes use of 1/2" wall board flush to both
front faces.
** Peninsula model framing width assumes use of 1/2" wall
board flush to the end face.
A
C
B
A
C
B
inches)
"B"
"C"*
Framing
Framing
Width
Depth
40"
23"*
39"**
23"*
Figure 5
27451-6-0614