Gardena 1255 Instrukcja obsługi - Strona 3
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Sprzęt do trawników i ogrodów Gardena 1255. Gardena 1255 9 stron. Valve box
Również dla Gardena 1255: Instrukcja obsługi (8 strony), Instrukcja obsługi (8 strony), Instrukcja obsługi (11 strony)
3. Assembly
Installing a
Central Filter :
Install the Valve Box :
1
2
Connect GARDENA
connecting pipes
to valve box :
4
5
6
2
2
7
2
V 3 :
Connect 2 Valve Boxes V 3 :
3
We recommend installing the GARDENA Central Filter
Art. 1506 / 1510 upstream of the watering system to
protect the components of the watering system from
dirt and contamination. If you are using dirty water, a
filter must be installed upstream of the watering system.
V Grease all O-rings and metal securing clips before
assembly ! Push an O-ring over each end of the
telescopic pipe
1. Install the Valve Box
20 cm x 30 cm x 10 cm (V1) / 30 cm x 35 cm x 10 cm (V 3).
This ensures proper drainage of the box.
2. Install the valve box with the top edge of the box at ground
level. This avoids damage when mowing the lawn.
When installing the Valve Box, the lid must be closed. The
adjacent earth may only be carefully compacted to prevent
the walls getting pressed in and the lid from then no longer
closing completely.
If necessary, support walls from inside with spacers when
compacting earth.
Only for Valve Box V 3 :
5
The distributor
connected to the watering system in various ways.
4
1. Screw cover caps
2. Insert the distributor
secure to the Valve Box from the inside using the two nuts
3. Screw the drain cap
For Valve Box V1 and V 3 :
1. Push the connections
secure to the Valve Box from the outside using the two nuts
The GARDENA Connecting Pipes 25 mm Art. 2700 / 2701 and
32 mm Art. 2704 / 2705 can be connected using the GARDENA
Connectors 25 mm Art. 2762 and 32 mm Art. 2768.
Via the 1" x 1"-Connector Art. 2758-00.900.01, 2 Valve Boxes V 3
can be connected.
v Screw the 1" x 1"-Connector
of the two Valve Boxes V 3.
8
B
/
.
1
on a bed of coarse gravel
has 3 inputs. The Valve Box can therefore be
4
onto the unused inputs.
5
into the Valve Box from the outside and
6
onto the distributor
7
into the Valve Box from the inside and
3
onto the open distributor outputs
2
approx.
2
5
.
2
.
9