Fronius KD Supply 2500 Instrukcja obsługi - Strona 10

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla System spawania Fronius KD Supply 2500. Fronius KD Supply 2500 20 stron.
Również dla Fronius KD Supply 2500: Instrukcja obsługi (16 strony)

Fronius KD Supply 2500 Instrukcja obsługi

Fitting the KD Supply 2500 to the trolley

General remarks

The welding system can be fitted to a trolley to increase the mobility of the system.
IMPORTANT!
If the welding system is not equipped with an auto-transformer or a cooling unit, the
KD Supply 2500 must be installed right at the bottom.
► If a cooling unit is present, fit it right at the bottom and place the KD Supply on top of it.
Fitting the KD
Supply 2500 to
the base of the
trolley
10
If there are no fastening brackets on
1
the trolley:
Attach two fastening brackets to the
base of the trolley and secure each
one using three „Extrude-Tite" screws.
Place the KD Supply 2500 on the base
2
of the trolley.
Using „Extrude-Tite" screws, fasten the
3
KD Supply 2500 at the front and back
to the fastening brackets on the base
of the trolley.