Fronius KD Supply 2500 Instrukcja obsługi - Strona 10
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla System spawania Fronius KD Supply 2500. Fronius KD Supply 2500 16 stron.
Również dla Fronius KD Supply 2500: Instrukcja obsługi (20 strony)
10
11
12
13
14
Risk of short circuit from kinked or damaged cables.
This can result in serious personal injury and damage to property.
▶
15
16
Danger from machines falling or toppling over.
This can result in serious personal injury and damage to property.
▶
Establishing a
LocalNet connec-
tion between the
KD Supply 2500
and the power
source
10
Carefully place the KD Supply 2500 on the cooling unit
Using two „Extrude-Tite" screws, fasten the KD Supply to the fastening bars (2) on
the front and back of the cooling unit
Position the power source over the KD Supply 2500 using a suitable hoisting device
Pull the power source connector as far as possible through the opening on the un-
derside of the power source
Make connection between power source and cooling unit
CAUTION!
When positioning the KD Supply 2500, ensure that the cables are not kinked.
Carefully place power source on KD Supply 2500
Using two „Extrude-Tite" screws, fasten the power supply to the fastening bars (1) on
the front and back of the KD Supply 2500.
CAUTION!
Ensure that all screw connections are secure.
Connect the power source and the KD
1
Supply 2500 using the LocalNet cable
supplied with the KD Supply 2500:
-
Power source: LocalNet interface
-
KD Supply 2500: LocalNet X9.1 inter-
face (front)