Fronius TPS 5000 Instrukcja instalacji - Strona 10
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla System spawania Fronius TPS 5000. Fronius TPS 5000 20 stron. Second earthing socket at rear
Również dla Fronius TPS 5000: Instrukcja instalacji (20 strony)
Removing the hexagon head screw, width = 19
Removing the hexagon nut, width = 32
Mounting the current-socket blanking caps
Re-mounting the front current socket
10
(9)
(e)
(9)
(e)
Remove the front current socket:
4
-
Undo the hexagon head screw
(c)with the n°19 flat spanner
-
Remove the hexagon head
screw
(c)
Remove along with the screw:
-
belleville spring washer
-
socket star
-
the existing current cable
-
Undo the hexagon nut (d) with the
reversible ratchet (C) and the "so-
cket for socket wrench, width 32
-
Remove the hexagon nut
-
Remove insulating washer
-
Pull out the front (-) current so-
cket towards the front
(d)
Mount the current-socket blanking
5
caps (9):
onto the front (-) current so-
a)
cket that you removed in Step
4
b) onto the current socket contai-
ned in the installation kit
The recess (e) must point downwards.
Mount the front (-) current-socket,
6
complete with its blanking cap:
-
Insert the front (-) current-so-
cket, working from the outside
towards the inside
-
Insert insulating washer
-
Screw on the hexagonal nut
-
Tighten the hexagonal nut with
the torque wrench and the "so-
cket for socket wrench, width
32"
-
Thightening torque 35 Nm
IMPORTANT! The current-socket re-
cess (e) must point downwards.