Kohler Adair K-9338T Instrukcja instalacji - Strona 4
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Toalety Kohler Adair K-9338T. Kohler Adair K-9338T 9 stron. Vtreous china two-piece toilet
INSTALLATION
TO REMOVE EXISTING
TOILET
Turn off the water supply. Flush the
toilet, and use a sponge to remove the
remaining water from the tank and
bowl. Disconnect the supply shut-off
valve (if present), and remove the old
tank and bowl.
Remove old gasket from the floor and
closet flange with a putty knife.
Remove old T-bolts and discard them.
NOTICE:
If a new toilet is not installed
immediately, temporarily stuff a rag in
the closet flange.
Install two new 8mm (5/16") diameter
T-bolts into the closet flange.
NOTICE:
Do not use white cement or
high lime content cements to install
this toilet. The expansion of cement
due to a rise in temperature may make
the toilet crack or cause damage.
Kohler is not responsible for any
damage caused by installation with the
use of cement.
TO INSTALL SUPPLY
SHUT-OFF VALVE
Install toilet supply shut-off valve so it
is 229mm above floorline and 105mm
to the left of the centerline of the closet
flange. Centerline of supply shut-off
outlet should extend 102mm from
finished wall. Install the supply shut-off
valve with outlet vertcial.
TO INSTALL NEW TOILET
Place new toilet upside down on
padding. Firmly place gasket on toilet
outlet.
NOTE 1:
Wax ring type toilet gasket
should not be installed at temperatures
less than 21 .
NOTE 2:
If you are using a toilet
gasket with an integral plastic sleeve,
make sure the gasket is positioned
with the sleeve facing away from the
toilet.
If you temporarily plugged the closet
flange with a rag, remove the rag at
this time and ensure that the drain pipe
is clear and free of debris.
1280754-T01-B
Closet Flange
Fig.#2
2
T-Bolts
T
Fig.#3
3
Supply Shut-Off Valve
229
305/400
Toilet Outlet
Toilet Gasket
Fig.#5
5
-4-
(
Closet Flange
105
Closet Flange
Centerline
Fig.#4
4
1
2
)
T
8mm
T
229mm
105mm
102mm
21