Kohler WELLWORTH LITE K-4512 Instrukcja instalacji - Strona 3
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Toalety Kohler WELLWORTH LITE K-4512. Kohler WELLWORTH LITE K-4512 8 stron. Vitreous china reverse trap toilets
INSTALLATION
TO REMOVE EXISTING TOILET
Turn off water supply. Flush the toilet and sponge out re-
maining water from tank and bowl. Disconnect supply
valve and remove old tank and bowl.
Remove old gasket from the floor and closet flange with
a putty knife. Remove old T-bolts and discard.
NOTICE: If a new toilet is not installed immediately,
temporarily stuff a rag in the closet flange.
Install new 5/16" diameter T-bolts.
TO INSTALL NEW SUPPLY SHUT-OFF
VALVE
Install toilet supply shut-off valve so it is 9" above floorline
and 4-1/8" to the left of the centerline of the closet flange.
Centerline of supply shut-off outlet should extend 4" from
finished wall. Install the supply shut-off valve with outlet
vertical.
Kohler Co., Kohler, WI
T-Bolts
9"
10"
3
Closet Flange
Fig. #2
Closet Flange
Fig. #3
Supply Shut-Off
Valve
4-1/8"
Fig. #4
BA
111864-2-
(-)