Kohler K-20195 Instrukcja instalacji i obsługi - Strona 6
Przeglądaj online lub pobierz pdf Instrukcja instalacji i obsługi dla Wyposażenie wnętrz Kohler K-20195. Kohler K-20195 41 stron. Vanity
Pilot Hole
Washer
Lag Bolt
3. Secure the Vanity
CAUTION: Risk of personal injury. Select 250 lb (113.4 kg)
load bearing 5/16" lag bolts with a length to clear obstacles
in the wall and 5/16" washers. Calculate the proper lag bolt
length by adding the following: 1-1/2" (38 mm) backing
material, plus the wallboard thickness, plus the back rail
thickness.
IMPORTANT! Risk of product damage. The vanity is heavy and
cumbersome to move. Obtain sufficient help to lift or move the
vanity to avoid impacting, sliding, or side-loading the legs.
Position and Level
With assistance, lift and place the vanity in position against the
finished wall. Do not drag the vanity into position.
Verify the vanity is level and the back rail is plumb against the
wall. If necessary turn the leveler(s) to adjust the unit.
Using a 1/4" drill bit, drill pilot holes through the back rail and
the finished wall. Verify the pilot holes are positioned to ensure
the lag bolts will engage the 2x6 backing material.
Secure
Secure the vanity to the wall with two 5/16" lag bolts and
washers (not provided).
1304474-2-A
Finished
6
Leveler
Kohler Co.