Aqua Creek Products F-12PPL-HD-AT2-05 Podręcznik - Strona 8

Przeglądaj online lub pobierz pdf Podręcznik dla Systemy podnoszenia Aqua Creek Products F-12PPL-HD-AT2-05. Aqua Creek Products F-12PPL-HD-AT2-05 14 stron. Portable lift

Returning The Patriot-AT2 To Transport Mode
CLOSE-UP DETAIL: GUIDE FRAME
1] ROTATE LIFT BACK UNTIL LOW
WHEELS ARE AT CART LEVEL.
HANDLE
FIXING ANCHOR (IN DECK)
BRAKE FOOT IS DOWN
BEFORE TILT AND ROLL
1.
Tilt the lift back and down until the lower wheels are at the cart level.
2.
Roll the lift back and onto the cart. Roll all the way back to the end of the guide frames
(see close-up detail).
3. Pivot
the lift forward and down until it is resting on the cart. Rotate the brake-foot
handle counter-clockwise and raise it off the deck. Remove the fi xing bolt (if applicable)
and unlock the casters.
The lift is now ready to move.
8
Copyright © 2019 Aqua Creek Products All Rights Reserved
GUIDE-FRAME
BACK END
2] ROLL LIFT BACK TO
END OF GUIDE FRAMES.
TILT AND ROLL ONTO CART
FIGURE 3
REMOVE
FIXING-BOLT
TO TRANSPORT
(WHERE APPLICABLE)
STAND
HERE
POOL WALL
3] TILT LIFT FORWARD ONTO
CART FOR TRANSPORT.
BRAKE FOOT IS UP
TRANSPORT POSITION
Revised 6/18/19
REMOVE
FIXING-
BOLT TO
MOVE