Anchor Installation: Core-drill Retro-fi t
Place the anchor in the hole and 'dry-fi t' it fi rst to make sure the anchor will be fl ush and
4.
plumb with the fi nished deck surface when installed. Adjust the hole as needed.
NOTE: Pool decks with pavers or thick tiles may require other anchor options. Contact Aqua Creek Products.
Inject epoxy adhesive into each hole starting at the bottom until the hole is 1/3 to 1/2 full.
5.
NOTE: We recommend using masking tape around the top of the anchors so that no epoxy gets inside the anchors.
1/2" X 1 1/2"
HEX BOLT
1/2" FLAT
WASHER
1" X 4"
FIXING ANCHOR
Install the anchor into the epoxy fi lled hole by pushing down and twisting back and
6.
forth to evenly distribute the epoxy around the anchor. Push down until it is fl ush with the
fi nished deck surface. Clean off any excess epoxy. Adjust the anchor as needed to make
sure it is fl ush and plumb with the deck surface. This should be done during the adhesives'
specifi ed 'gel time' (see epoxy manufacturers' instructions).
Let the epoxy cure for at least 24 hours before installing the lift (or where applicable
7.
according to the epoxy manufacturers' instructions).
6
Copyright © 2019 Aqua Creek Products All Rights Reserved
FIGURE A
(CONTINUED)
MIGHTY LIFT
MAIN ASSEMBLY
1.9" POST
1.9" X 6" ANCHOR
(AQUA CREEK OR
EQUIVALENT)
ANCHOR MUST BE BONDED
ACCORDING TO LOCAL
REQUIREMENTS
Revised 4/23/19