Aqua Flo AQUV AQUV-12R22 Instrukcja obsługi - Strona 7
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Systemy filtracji wody Aqua Flo AQUV AQUV-12R22. Aqua Flo AQUV AQUV-12R22 16 stron. Ultraviolet disinfection system
Unpacking the UV System
Your UV system includes the following items:
UV UNIT
Install Location
If your water comes from a well or a lake/river etc., the UV should be installed after your pump and pressure tank. To prevent damage to the UV
system, do not install it between well pump and pressure tank. If you have other water filters/conditioner installed, such as softener/iron filter etc.,
the UV system should always be installed as the last step of treatment before the water pipes divide into hot and cold (Fig 2).
Hot water
Cold water
to house
to house
UV System
Water Heater
Fittings Required for Installation (Not Included)
Fittings required for a typical install on 3/4" copper pipe are 3/4" FNPT female adapters, 3/4" Tee, 3/4" Elbows, 3/4" copper pipe, 3/4" union
couplings and 3/4" ball valves. You may need different fittings if your pipe size or material is different. If you are unsure of what fittings to use,
please call Aqua Flo.
UV light can degrade plastics over time. If your water pipe is plastic (such as PEX), it is
recommended that you use at least 6 to 12 inches of UV-resistant material (e.g. copper)
on the inlet and outlet of the UV unit to prevent damage, and potential flooding.
Ballast with lamp
connector
Gland Nut
UV Lamp
Quartz Dome
Fig. 2
Water Meter
City Water
OR
Well Water
Pressure Tank
Well Water
CAUTION
Ballast Mounting
Nut & Bolts
Ballast Mounting
Wrench
Fig. 3
Water
Water
OR
Flow
Flow
Dome O-Ring
(Thicker)
Lamp Spring
Gland Nut O-Ring
(Thinner)
Nut & bolts
Water
Water
Flow
Flow
7